To report any issues with the information below please email executivecycle@westberks.gov.uk.

Agenda item

Application No. and Parish: 21/02767/FULMAJ – 17 Clifton House, Reading Road, Pangbourne

Proposal:

Construction of 13 flats and courtyards with reconfigured car park. Demolition of single storey flat roofed building.

Location:

17 Clifton House, Reading Road, Pangbourne

Applicant:

PBP Ltd

Recommendation:

Grant planning permission subject to the completion of a s106 legal agreement

 

Minutes:

The Committee considered a report (Agenda Item 4(2)) concerning Planning Application 21/0276/FULMAJ in respect of a proposal to construct 13 flats and a courtyard with a reconfigured car park at 17 Clifton House, Reading Road, Pangbourne. The proposal included the demolition of a single storey flat roofed building.

Ms Emma Nutchey, Principal Planning Officer, introduced the report to Members, which took account of all the relevant policy considerations and other material planning considerations. In conclusion the report detailed that the proposal was acceptable in planning terms and officers recommended that the Service Director for Development and Regulation be authorised to grant planning permission subject to the completion of a s106 agreement and subject to the conditions outlined in the main and update reports.

In accordance with the Council’s Constitution, Mr Les Billings and Mrs Mags O’Keefe, objectors, and Mr Adrian Keal, applicant, addressed the Committee on this application.

Objector Representation

Mr Les Billings and Mrs Mags O’Keefe in addressing the Committee raised the following points:

·         Mr Billings commented that he had no overall objection to the application, but wanted to receive assurances that the boundary wall would be replaced.

·         Mr Billings felt that condition 26 inferred that the boundary wall did not have to be replaced until just prior to occupation. There was concern that demolition of the boundary wall would immediately lead to a loss of security at the site and at Mr Billings’ address.

·         Mrs O’Keefe echoed Mr Billings’ comments and acknowledged that she was not opposed to the development, but was concerned that loss of the boundary wall for any length of time would lead to the damage of a number of established garden plants which were of sentimental value.  

Member Questions to the Objectors

Members did not have any questions of clarification.

Agent Representation

Mr Adrian Keal in addressing the Committee raised the following points:

·         Mr Keal welcomed the Officer’s recommendation to approve the application.

·         Mr Keal suggested that the introduction of thirteen flats to the site would improve the surveillance and security of the area.

·         Mr Keal reported that the developer had responded to comments by the Tree Officer by revising the parking area in order to retain a cherry tree, which would enhance the setting of the car park.

·         Mr Keal reported that he had met with Mr Billings and Mrs O’Keefe and that a strategy to comply with condition 26 and to replace the boundary wall as a matter importance had been agreed. Mr Keal reported that the developer had noted and would accommodate the concern not to leave the site open. 

Member Questions to the Agent

Members did not have any questions of clarification.

Ward Member Representation

Councillor Gareth Hurley was not present at the meeting.

Questions to Officers

In response to a request from Councillor Linden, Ms Nutchey read out condition 26 (as detailed below), which had not been included within the original agenda pack as produced on 14 September 2022.

Councillor Pask queried whether the condition could be amended to take account of the concerns raised by the objectors.

Mr Dray was not keen to amend the condition and place an unreasonable burden on the developer, however suggested amendment to a pre-commencement condition which would require the developer and objectors to agree a timetable of works that both were happy with.

Councillor Geoff Mayes queried whether the balustrade fencing was at the top or the bottom of the railway embankment. Ms Nutchey clarified that it was at site level and owned by Network Rail. Ms Nutchey further clarified that the trees being trimmed were within the land owned by Network Rail.

Councillor Geoff Mayes queried whether the development would utilise solar panels, and whether they would reduce the energy bill for the occupiers of the building, or whether the savings would go to the developer.

Ms Nutchey confirmed that the developer was looking to utilise solar panels on the building to reduce the need for power from the grid.

Councillor Pask commented that Councillor Mayes query did not relate to a planning matter.

Mr Dray clarified that discussions relating to the building and use of solar panels was a planning matter, but the lease and rental agreement were not a matter for discussion.  

Debate

Councillor Somner opened the debate by commenting that he was encouraged by the application and particularly the work that complied with the Council Policy CS51. Whilst he noted that the development would not be achieving complete net zero, Councillor Somner recognised that the proposals went a long way towards it and suggested that such aspirations should be encouraged.

Councillor Somner noted that the objections were few and appeared to be allayed by making a minor amendment to condition 26. On that basis Councillor Somner commented that he was happy to propose to accept the Officer’s recommendation and grant planning permission subject to the conditions listed in the main report and update report.

Councillor Jo Stewart seconded the proposal.

Councillor Mackinnon commented that the application presented a good environmental development and that the developer had displayed a positive attitude in dealing with the objectors’ concerns. Councillor Mackinnon supported the Officer’s recommendation.

The Chairman invited Members of the Committee to vote on the proposal by Councillor Richard Somner, seconded by Councillor Jo Stewart to grant planning permission, subject to the amendment to condition 26 to make it a pre-commencement condition to agree timetables for the demolition and creation of the new boundary wall and subject to the completion of a s106 agreement. At the vote the motion was carried.

RESOLVED that the Service Director for Development and Regulation be authorised to grant planning permission subject to the following conditions:

Conditions

1.    Commencement of development

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004).

2.    Approved plans

The development hereby permitted shall be carried out in accordance with the approved plans and documents listed below:

Site location plan 02-00

Red line boundary and site access 02-60 Rev. B

Proposed site plan 02-03 Rev. C

Proposed site block plan 02-02 Rev. C

Proposed site plan with PV panels 02-04 rev. A

Proposed block A elevations (1 of 2) 05-10 rev. B

Proposed block A elevations (2 of 2)

Proposed block B elevations 05-12 Rev. B

Proposed first floor plans 03-11

Proposed second floor plans 03-12

Proposed third floor plans 03-13

External works details 05-20

Proposed ground floor plans 03-10 Rev. B

Ecological Impact Assessment by ECOSA

Arboricultural Impacts Assessment by SJ Stephens Associates

Proposed Landscape Strategy 02-04 Rev. B

Planning Noise Assessment by RSK Acoustics report 206/0400/R1

Planning Statement

Carbon Energy Statement

Archaeological desk-based assessment by Thames Valley Archaeological Services

Surface Water Drainage Strategy by Glanville Issue 4

Proposed site drainage 02-63 Rev. B

Transport Statement by Bellamy Roberts

Highways technical Note by Bellamy Roberts 20th Dec 2021

Site ownership and car parking strategy 02-65 Rev. B

Proposed bin and bike store 02-53 Rev.A

Semi vertical bike rack information sheet

Reason: For the avoidance of doubt and in the interest of proper planning.

3.    Schedule of materials

No development shall commence until a schedule of the materials to be used in the construction of the external surfaces of the development hereby permitted, has been submitted to and approved in writing by the Local Planning Authority. Samples of materials shall be made available upon request. Thereafter the development shall be carried out in accordance with the approved details.

Reason: To ensure that the external materials respect the character and appearance of the area. This condition is applied in accordance with the National Planning Policy Framework, Policies CS14 and CS19 of the West Berkshire Core Strategy (2006-2026) and Supplementary Planning Document Quality Design (June 2006). A pre-commencement condition is required because the approved materials will be used throughout construction.

4.    Floor levels

No development shall take place until details of the finished floor levels of the building hereby permitted in relation to existing and proposed ground levels have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved levels.

Reason: To ensure a satisfactory relationship between the proposed development and the adjacent land. This condition is imposed in accordance with the National Planning Policy Framework, Policies Cs14 and CS19 of the West Berkshire Core Strategy (2006-2026) and Supplementary Planning Document Quality Design (June 2006). A pre-commencement condition is required because the ground levels need to be established before works start.

5.  Hard landscaping

No property shall be occupied until the hard landscaping of the site has been completed in accordance with a hard landscaping scheme that has first been submitted to and approved in writing by the Local Planning Authority. The hard landscaping scheme shall include details of any boundary treatments (e.g. walls, fences) and hard surfaced areas (e.g. driveways, paths, patios, decking) to be provided as part of the development.

The scheme must include a suitable trespass proof steel palisade fence of at least 1.8m in height adjacent to Network Rail’s boundary and make provision for its future maintenance and renewal without encroachment upon or over-sailing of Network Rail land. Network Rail’s existing fencing / wall must not be removed or damaged and at no point either during construction or after works are completed on site should the foundations of the fencing or wall or any embankment therein be damaged, undermined or compromised in any way.

Reason: Landscaping is an integral element of achieving high quality design and safety fencing is required adjacent to the railway line at the request of Network Rail to ensure public safety. This condition is applied in accordance with the National Planning Policy Framework, Policies CS14 and CS19 of the West Berkshire Core Strategy (2006-2026), and the Quality Design SPD.

6.    Details of solar panels

No property shall be occupied until the PV panels have been installed in accordance with the approved details which have first been submitted to and approved in writing by the Local Planning Authority. The details shall include the make of the panels and details to show how they sit within the roof and their coverage. The panels shall thereafter be retained in accordance with the approved details.

Reason: To ensure that the PV panels are sympathetic to the appearance of the property and do not harm the character and appearance of the conservation area. This is in accordance with the guidance within the National Planning Policy Framework and Policies CS14 and CS19 of the West Berkshire Core Strategy (2006-2026).

7.    Construction method statement

No development shall take place until a Construction Method Statement has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. The statement shall provide for:

(a) The parking of vehicles of site operatives and visitors

(b) Loading and unloading of plant and materials

(c) Storage of plant and materials used in constructing the development

(d) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing

(e) Wheel washing facilities

(f) Measures to control the emission of dust and dirt during construction

(g) A scheme for recycling/disposing of waste resulting from demolition and construction works

(h) A site set-up plan during the works

Reason: To safeguard the amenity of adjoining land uses and occupiers and in the interests of highway safety. This condition is imposed in accordance with the National Planning Policy Framework, Policies CS5 and CS13 of the West Berkshire Core Strategy (2006-2026), Policy TRANS 1 of the West Berkshire District Local Plan 1991-2006 (Saved Policies 2007). A pre-commencement condition is necessary because insufficient detailed information accompanies the application and measures may be required to be undertaken throughout the construction phase and so it is necessary to approve these details before any development takes place.

8.  Hours of work (construction/demolition)

No demolition or construction works shall take place outside the following hours:

7:30am to 6:00pm Mondays to Fridays;

8:30am to 1:00pm Saturdays;

No work shall be carried out at any time on Sundays or Bank Holidays.

Reason: To safeguard the amenities of adjoining land uses and occupiers. This condition is applied in accordance with the National Planning Policy Framework, and Policy CS14 of the West Berkshire Core Strategy (2006-2026).

9.    Unexpected contamination

If any previously unidentified contaminated land is found during demolition and/or construction activities, it shall be reported immediately in writing to the Local Planning Authority (LPA). Appropriate investigation and risk assessment shall be undertaken, and any necessary remediation measures shall be submitted and approved in writing by the LPA. These submissions shall be prepared by a competent person (a person with a recognised relevant qualification, sufficient experience in dealing with the type(s) of pollution or land instability, and membership of a relevant professional organisation). The remediation scheme shall ensure that, after remediation, as a minimum, the land shall not be capable of being determined as contaminated land under Part IIA of the Environmental Protection Act 1990. Thereafter, any remediation measures shall be carried out in accordance with the approved details. Unless otherwise agreed in writing by the LPA, the development shall not be occupied until any approved remediation measures have been completed and a verification report to demonstrate the effectiveness of the remediation has been submitted to and approved in writing by the Local Planning Authority.

Reason: To ensure that any unexpected contamination encountered during the development is suitably assessed and dealt with, such that it does not pose an unacceptable risk to human health or the environment. This condition is applied in accordance with paragraphs 170, 178, 179 and 180 the National Planning Policy Framework, and Policy OVS.5 of the West Berkshire District Local Plan 1991-2006 (Saved Policies 2007).

10. Noise mitigation measures

The development hereby approved shall not be occupied until the noise mitigation measures as set out in the Planning Noise Assessment by RSK Acoustics ref 206/0400/R1, submitted with the application, have been completed in accordance with these approved details. The noise mitigation measures shall be retained and maintained thereafter.

Reason: To protect future residents from noise from the railway line. To ensure a satisfactory relationship between the proposed development and the adjacent Railway. This condition is imposed in accordance with the National Planning Policy Framework, Policy CS14 of the West Berkshire Core Strategy (2006-2026) and Supplementary Planning Document Quality Design (June 2006).

11.  Lighting design strategy for light sensitive biodiversity

No property shall be occupied until a lighting design strategy for biodiversity has been submitted to and approved in writing by the Local Planning Authority. The strategy shall:

a) identify those areas/features on site that are particularly ecologically sensitive and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and

b) show how and where external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent the above species using their territory or having access to their breeding sites and resting places.

All external lighting shall be installed in accordance with the specifications and locations set out in the strategy, and these shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority.

Reason: The introduction of artificial light might mean species are disturbed and/or discouraged from using their breeding and resting places, established flyways or foraging areas. Such disturbance can constitute an offence under relevant wildlife legislation. This condition is applied in accordance with the National Planning Policy Framework, and Policy CS17 of the West Berkshire Core Strategy 2006-2026.

12. Landscape and Ecological Management Plan (LEMP)

No development shall take place until a Landscape and Ecological Management Plan (LEMP) (also referred to as a Habitat or Biodiversity Management Plan) has been submitted to and be approved in writing by the Local Planning Authority. The content of the LEMP shall include the following:

(a) Description and evaluation of features to be managed.

(b) Plans to show the location of at least 4 bat roosting features and 10 swift boxes integrated within the new buildings.

(c) Plans shall highlight any areas where breathable roofing membrane is used within the roof.

(d) Ecological trends and constraints on site that might influence management.

(e) Aims and objectives of management.

(f) Appropriate management options for achieving aims and objectives.

(g) Prescriptions for management actions.

(h) Preparation of a work schedule (including an annual work plan capable of being rolled forward over a five-year period detailing the ongoing monitoring and remedial measures and the organisation responsible).

The LEMP shall also include details of the legal and funding mechanism(s) by which the long-term implementation of the plan will be secured by the developer with the management bodies responsible for its delivery.

The plan shall also set out (where the results from monitoring show that conservation aims and objectives of the LEMP are not being met) how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme.

The approved plan will be implemented in accordance with the approved details.

Reason: This condition is applied in accordance with the National Planning Policy Framework, and Policy CS17 of the West Berkshire Core Strategy 2006-2026. A pre-commencement condition is required because the LEMP may need to be implemented during construction.

13. Construction Environmental Management Plan

No development shall take place (including demolition, ground works, vegetation clearance) until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include the following:

(a) Risk assessment of potentially damaging construction activities.

(b) Identification of “biodiversity protection zones”.

(c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements).

(d) The location and timing of sensitive works to avoid harm to biodiversity features.

(e) The times during construction when specialist ecologists need to be present on site to oversee works.

(f) Responsible persons and lines of communication.

(g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person.

(h) Use of protective fences, exclusion barriers and warning signs.

The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the local planning authority.

Reason: This condition is applied in accordance with the National Planning Policy Framework, and Policy CS17 of the West Berkshire Core Strategy 2006-2026. A pre-commencement condition is required because the CEMP will need to be adhered to throughout construction.

14. Ecological Impact Assessment

The development hereby approved shall be carried out in accordance with the Ecological Impact Assessment by ECOSA dated October 2021 unless otherwise agreed in writing by the Local Planning Authority. The measures shall thereafter be retained and maintained in accordance with the approved details.

Reason: To protect species on site in accordance with the National Planning Policy Framework, and Policy CS17 of the West Berkshire Core Strategy 2006-2026.

15. Archaeology

No development including site clearance shall take place within the application area until a Stage 1 written scheme of investigation (WSI) for a programme of archaeological work has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI no demolition or development shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed works. If heritage assets of archaeological interest are identified by Stage 1, then for those parts of the site which have archaeological interest a Stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the WSI no site clearance work or development shall take place other than in accordance with the agreed WSI, which shall include: A. The Statement of significance and research objectives, the programme and methodology of archaeological site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works.

B. The programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting archaeological material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the Stage 2 WSI.

Reason: To ensure that any significant archaeological remains that are found are adequately recorded. Such an approach follows the guidance set out in paragraph 205 of the 2021 National Planning Policy Framework and is accordant with the requirements of Policy CS19 of the West Berkshire Local Plan (2006-2026) 2012.

16. Electric Charging Points

No development shall take place until details of electric vehicle charging points have been submitted to and approved in writing by the Local Planning Authority. No dwelling shall be occupied until the electric vehicle charging points have been provided in accordance with the approved drawings. The charging points shall thereafter be retained and kept available for the potential use of an electric car.

Reason: To promote the use of electric vehicles. This condition is imposed in accordance with the National Planning Policy Framework (February 2019), Policies CS13 and CS14 of the West Berkshire Core Strategy (2006-2026), Policy P1 of the Housing Site Allocation DPD and Policy TRANS1 of the West Berkshire District Local Plan 1991-2006 (Saved Policies 2007). A pre-commencement condition is required because the location of points must be determined prior to construction work.

17. Access construction prior to occupation

No dwelling shall be occupied until the alterations to the access onto Reading Road have been constructed in accordance with the approved drawings.

Reason: In the interest of road safety. This condition is imposed in accordance with the National Planning Policy Framework and Policy CS13 of the West Berkshire Core Strategy (2006-2026).

18. Visibility splays before development

First works on site shall constitute the creation of the approved visibility splays of 2.4 metres by 25 metres at the site access. The visibility splays shall, thereafter, be kept free of all obstructions to visibility above a height of 0.6 metres above carriageway level.

Reason: In the interests of road safety. This condition is imposed in accordance with the National Planning Policy Framework and Policy CS13 of the West Berkshire Core Strategy (2006-2026).

19. Parking/turning in accord with plans

No dwelling shall be occupied until the vehicle parking and/or turning space have been surfaced, marked out and provided in accordance with the approved plans. No doors shall be erected on the front of the car ports to enclose them. The parking and/or turning space shall thereafter be kept available for parking (of private motor cars and/or light goods vehicles) at all times.

Reason: To ensure the development is provided with adequate parking facilities, in order to reduce the likelihood of roadside parking that would adversely affect road safety and the flow of traffic. This condition is imposed in accordance with the National Planning Policy Framework, Policy CS13 of the West Berkshire Core Strategy (2006-2026) and Policy TRANS1 of the West Berkshire District Local Plan 1991-2006 (Saved Policies 2007).

20. Cycle parking

No dwelling shall be occupied until the cycle parking has been provided in accordance with the approved drawings and this area shall thereafter be kept available for the parking of cycles at all times.

Reason: To ensure the development reduces reliance on private motor vehicles and assists with the parking, storage and security of cycles. This condition is imposed in accordance with the National Planning Policy Framework, Policy CS13 of the West Berkshire Core Strategy (2006-2026) and Policy TRANS1 of the West Berkshire District Local Plan 1991-2006 (Saved Policies 2007).

21. No doors on car ports

The car ports hereby permitted shall be kept available for parking (of private cars and/or private light goods vehicles) at all times. Notwithstanding the provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking, re-enacting or modifying that Order with or without modification), no physical alterations shall be made to the car ports (including enclosing the sides / installed doors), unless permission has been granted by the Local Planning Authority as a result of an application being submitted for that purpose.

Reason: To ensure that the car ports are kept available for vehicle parking, and are not converted into garages, in the interest of road safety. The residential parking standards of Policy P1 do not count garages towards parking provision. This condition is applied in accordance with the National Planning Policy Framework, Policies CS13 and CS14 of the West Berkshire Core Strategy 2006-2026, Policy P1 of the Housing Site Allocations DPD 2006-2026, and Policy TRANS1 of the West Berkshire District Local Plan 1991-2006 (Saved Policies 2007).

22. Thames Water

No development hereby approved shall commence until a Source Protection Strategy detailing how the developer intends to ensure the water abstraction source is not detrimentally affected by the proposed development both during and after its construction has been submitted to and approved in writing by the Local Planning Authority in consultation with Thames Water. The development shall be constructed in line with the recommendations of the strategy.

Reason: To ensure that the water resource is not detrimentally affected by the development. This condition is attached in accordance with the guidance within the National Planning Policy Framework. More detailed information can be obtained from Thames Waters' Groundwater Resources Team email GroundwaterResources@Thameswater.co.uk Tel: 0203 577 3603.

23. Arboricultural supervision condition

No development shall take place (including site clearance and any other preparatory works) until the applicant has secured the implementation of an arboricultural watching brief in accordance with a written scheme of site monitoring, which has first been submitted to and approved in writing by the Local Planning Authority.

Reason: Required prior to the commencement of development in order that the Local Planning Authority may be satisfied that the trees to be retained will not be damaged during development works and to ensure that, as far as is possible, the work is carried out in accordance with the approved details pursuant to section 197 of the Town and Country Planning Act 1990 in accordance with the objectives of the National Planning Policy Framework and Policies ADPP1, ADPP5, CS14, CS17, CS18 and CS19 of West Berkshire Core Strategy 2006-2026. A pre-commencement condition is necessary because insufficient detailed information accompanies the application; tree protection installation measures and site supervision works may be required to be undertaken throughout the construction phase and so it is necessary to approve these details before any development takes place.

24. Tree Protection

All Tree Protective Fencing shall be erected in accordance with the submitted SJ Stephens Tree Protection Plan, reference drawing number 1418-02 dated Feb 2022. The protective fencing shall be implemented and retained intact for the duration of the development. Within the fenced area(s), there shall be no excavations, storage or mixing of materials, storage of machinery, parking of vehicles or fires.

Reason: Required to safeguard and to enhance the setting within the immediate locality to ensure the protection and retention of existing trees and natural features during the construction phase in accordance with the National Planning Policy Framework and Policies ADPP1, ADPP5, CS14, CS17, CS18 and CS19 of the West Berkshire Core Strategy 2006-2026.

25. Landscaping

No development shall take place until a detailed soft landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The soft landscaping scheme shall include detailed plans, planting and retention schedule, programme of works, and any other supporting information. All soft landscaping works shall be completed in accordance with the approved soft landscaping scheme within the first planting season following completion of building operations / first occupation of the new dwelling (whichever occurs first). Any trees, shrubs, plants or hedges planted in accordance with the approved scheme which are removed, die, or become diseased or become seriously damaged within five years of completion of this completion of the approved soft landscaping scheme shall be replaced within the next planting season by trees, shrubs or hedges of a similar size and species to that originally approved.

Reason: Landscaping is an integral element of achieving high quality design. This condition is applied in accordance with the National Planning Policy Framework, Policies CS14 and CS19 of the West Berkshire Core Strategy (2006-2026), and the Quality Design SPD.

26. Details of boundary treatment

No development shall commence until details of the proposed boundary treatment to the rear of numbers 1-3 Pangbourne Place have been submitted to and approved in writing by the Local Planning Authority along with a timetable for the construction/erection of the approved boundary treatment. The approved boundary treatment shall thereafter be constructed in accordance with the approved details and timetable. This condition shall apply irrespective of the detail shown in the application documents.

Reason: To allow for different boundary treatment options to be considered and to ensure the boundary is marked by a safe and secure structure. This condition is applied in accordance with the National Planning Policy Framework, Policies CS14 and CS19 of the West Berkshire Core Strategy (2006 - 2026), and the Quality Design SPD.

27. Drainage Strategy

The development hereby approved shall be carried out in accordance with the Surface Water Drainage Strategy by Glanville, Issue 4: 6 July 2022 unless otherwise agreed in writing by the Local Planning Authority. No dwelling shall be first occupied until the drainage measures have been completed in accordance with the approve details. The measures shall thereafter be retained and maintained in accordance with the approved details.

Reason: To ensure a suitable drainage strategy is secured in accordance with Policy CS16 of the West Berkshire Core Strategy 2006-2026 and the guidance set out within the National Planning Policy Framework.

Heads of Terms for Section 106 Agreement

Affordable housing

Secure 4 shared ownership apartments.

Refusal Reasons (if Section 106 Agreement not completed)

Planning obligation

The application fails to provide an appropriate planning obligation to secure 4 affordable housing units on site (30% provision) as is required by Policy CS6 of the West Berkshire Core Strategy 2006-2026 and in accordance with the National Planning Policy Framework and the Council’s Planning Obligations SPD. This policy seeks to ensure the provision of affordable dwellings within the district where there is an identified need for such housing.

Informatives (if granted planning permission)

1.    Positive statement

This decision has been made in a positive way to foster the delivery of sustainable development having regard to Development Plan policies and available guidance to secure high quality appropriate development. The local planning authority has worked proactively with the applicant to secure a development that improves the economic, social and environmental conditions of the area.

2.    CIL

The development hereby approved results in a requirement to make payments to the Council as part of the Community Infrastructure Levy (CIL) procedure. A Liability Notice setting out further details, and including the amount of CIL payable will be sent out separately from this Decision Notice. You are advised to read the Liability Notice and ensure that a Commencement Notice is submitted to the authority prior to the commencement of the development. Failure to submit the Commencement Notice will result in the loss of any exemptions claimed, and the loss of any right to pay by instalments, and additional costs to you in the form of surcharges. For further details see the website at www.westberks.gov.uk/cil

3.   Access construction

The Asset Management team, West Berkshire District Council, Environment Department, Council Offices, Market Street, Newbury, RG14 5LD, or highwaysassetmanagment@westberks.gov.uk should be contacted to agree the access construction details and to grant a licence before any work is carried out within the highway. A formal application should be made, allowing at least four (4) weeks’ notice, to obtain details of underground services on the applicant’s behalf.

4.    Damage to footways, cycleways and verges

The attention of the applicant is drawn to the Berkshire Act, 1986, Part II, Clause 9, which enables the Highway Authority to recover the costs of repairing damage to the footway, cycleway or grass verge, arising during building operations.

5.    Damage to the carriageway

The attention of the applicant is drawn to the Highways Act, 1980, which enables the Highway Authority to recover expenses due to extraordinary traffic.

6.    Excavation in close proximity to the highway

In order to protect the stability of the highway it is advised that no excavation be carried out within 15 metres of a public highway without the written approval of the Highway Authority. Written approval would be obtained from the Asset Manager, West Berkshire District Council, Environment Department, Council Offices, Market Street, Newbury, RG14 5LD or highwaymaintenance@westberks.gov.uk

7.    Incidental works affecting the highway

Any incidental works affecting the adjoining highway shall be approved by, and a licence obtained from, the Principal Engineer (Streetworks), West Berkshire District Council, Transport & Countryside, Council Offices, Market Street, Newbury, RG14 5LD, telephone number 01635 – 503233, before any development is commenced.

8.    Official Postal Address

Please complete and online street naming and numbering application form at https://www.westberks.gov.uk/snn to obtain an official postal address(s) once development has started on site. Applying for an official address promptly at the beginning of development will be beneficial for obtaining services. Street naming and numbering is a statutory function of the local authority.

9.  Thames Water

A Groundwater Risk Management Permit from Thames Water will be required for discharging groundwater into a public sewer. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991. We would expect the developer to demonstrate what measures he will undertake to minimise groundwater discharges into the public sewer. Permit enquiries should be directed to Thames Water’s Risk Management Team by telephoning 020 3577 9483 or by emailing trade.effluent@thameswater.co.uk . Application forms should be completed on line via www.thameswater.co.uk. Please refer to the Wholesale; Business customers; Groundwater discharges section.

10. Thames Water

Thames Water will aim to provide customers with a minimum pressure of 10m head (approx 1 bar) and a flow rate of 9 litres/minute at the point where it leaves Thames Waters pipes. The developer should take account of this minimum pressure in the design of the proposed development.

11. Network Rail

Please see full comments from Network Rail dated 24th November 2021. This raises important issues with regards to drainage, fencing, and encroachment onto the railway, scaffolding, vibro-impact machinery, crane use, a 2m gap and lighting. It is essential this is read before works start on site.

Supporting documents: